PROJECTS

|
|
2004 GEOTECHNICAL INVESTIGATION for OPC/AEP Muskingum Unit
5 SCR Project, Waterford, OH
|
| |
Foster Wheeler Power Group, Inc.
Clinton, NJ |
| |
|
• Addition of NOx emissions reduction equipment,
consisting of a selective catalytic reduction unit and ammonia production
plant, to an existing coal fired power plant. • Performed
geotechnical investigation consisting of field exploration (five borings),
laboratory testing, engineering analysis, and report preparation.
• Geotechnical report hilited use of deep foundation systems
for heavily loaded SCR columns; recommended systems included micro-piles,
augered cast-in-place piles, and drilled piers. |
| 2004 SOIL/ROCK NAIL WALL PROJECT for Proposed
Walgreens Store, Scranton, PA |
| |
James Gerard, General Contractor
Scranton, PA |
| |
|
• Site preparation for proposed Walgreens store
specified cut along existing road which required construction of 25’
high retaining wall. Rock cut during site prep exposed potentially
unstable fractured rock with interbedded soil seams. • Performed
onsite inspection and evaluation of rock cuts and performed preliminary
programming of cut stabilization system using permanent soil/rock
nails with shotcrete structural facing. • Performed final
design and prepared construction documents for nail wall system, incorporating
a segmental modular concrete masonry unit wall “veneer”
facing. |
| 2004 UNDERWOOD MEMORIAL HOSPITAL UNDERPINNING
PROJECT, Woodbury, NJ |
| |
Durrant Construction Company
Somerville, NJ |
| |
|
• Hospital expansion project required installation
of new building foundations adjacent to, and below the bearing level
of existing building foundations. • Selected, performed
design (submitted signed and sealed calculations) and prepared construction
documents for underpinning system consisting of anchored steel sheet
piling. • Underpinning system integrated new foundations
with existing foundations to permit load redistribution. |
| 2003 STAIR TOWER UNDERPINNING PROJECT, Staten
Island, NY |
| |
The Law Firm of Hall & Hall
Staten Island, NY |
| |
|
• 7 year old office building addition was undergoing
objectionable settlement resulting in leaning and separation from
the existing office building. • Performed preliminary evaluation,
detailed design, and construction phase services. • Performed
evaluation of existing structural and subsurface conditions. Provided
recommendations regarding remedial action plan. • Selected
underpinning system, performed detailed design calculations, and prepared
construction documents (drawings, and specifications). Underpinning
system consisted of 9’ long helical piers extending through
the 6’ thick unsuitable fill layer into an underlying decomposed/fractured
rock layer • Prepared subcontract packages, solicited construction
bids; performed bid review and made recommendation to owner; coordinated
final contract terms. • Prepared and filed project permits
with Department of Buildings; performed controlled inspections and
served as Superintendent of Construction |
| 2003, 2004 EXCAVATION SHORING AND UNDERPINNING
PROJECT, Green Brook, NJ |
| |
GWS Contractors, Inc.
Jamesburg, NJ |
| |
|
• Environmental remediation project at private
residence required installation of shoring and underpinning support
system for 14’-17’ deep excavation. • Performed
geotechnical engineering investigation consisting of soil boring and
geotechnical report with recommendations. • Performed detailed
design of tieback system utilizing helical anchors. • Performed
detailed design of waler and bracing system. • Prepared
project drawings and specifications. • Provided onsite observation
services during construction. |
| SUBGRADE INSPECTION, Iselin, NJ |
| |
|
• Performed inspection of subgrade soils and prepared
inspection reports for installation of cast in place concrete pier
underpinning system in connection with environmental remediation project
at private residence. |
| 2003 LIFTING DEVICES DESIGN for Process Scale
Up Facility Project, New Brunswick, NJ |
| |
Bristol Myers Squibb
New Brunswick, NJ |
| |
|
• Multistory pharmaceutical process and administration
building complex for which Mssr. Morris was the civil/structural Engineer
of Record during previous employment. • Performed structural
evaluation of cGMP platforms for loads occurring during maintenance
operations. • Selected, prepared general arrangements, performed
design and prepared detail drawings for specialty lifting devices
in cGMP areas. |
| FIREPROOFING OPINION REPORT for Process Scale
Up Facility Project, New Brunswick, NJ |
| |
|
• Prepared professional opinion report delineating
application requirements for fireperoofing in rated floor assemblies. |
| 2003 BUILDING 39A RECORD DRAWINGS, New Brunswick,
NJ |
| |
Bristol Myers Squibb
New Brunswick, NJ |
| |
|
• Solvent drum storage building for which Mssr.
Morris was the civil/structural Engineer of Record during previous
employment. • Prepared project “Record” drawings
for civil, structural, electrical, piping, plumbing, architectural,
fire protection, and HVAC disciplines based on client provided drawing
mark-ups. • Drawings prepared using Autocad; hard copy and
electronic format delivered at project close-out. |
| 2003 FOUNDATION REMOVAL AND REPLACEMENT PROJECT,
Hamilton Twsp., NJ |
| |
Nabil Assad
Hamilton Township, NJ |
| |
|
• Foundation and basement wall of private residence
failed due to excessive settlement and lateral earth pressure.
• Performed geotechnical engineering investigation consisting
of soil borings and geotechnical report with foundation recommendations.
• Performed detailed design and prepared drawings for foundation
removal and replacement with deep foundation system consisting of
16’ long helical piers. • Prepared construction bid
packages; solicited construction bids; performed onsite construction
observation during critical operations. |
| 2003, 2004 SUBGRADE EVALUATION, Fort Dix, NJ |
| |
Materials Testing, Inc.
Edison, NJ |
| |
|
• Performed onsite inspection and prepared report
outlining recommended subgrade improvement procedures prior to placing
asphalt paving at new warehouse facility. |
CORRECTIVE STRUCTURAL WORK for Joint Replace
Medical Facility Project
McGuire Air Force Base, NJ |
| |
|
• Performed onsite inspection and prepared report
outlining corrective procedures for fabrication and erection deficiencies
in structural steel frame for new medical facility. Prepared detailed
corrective work program, and performed inspections of work. |
IMPORT AND FILL MATERIAL EVALUATION for Middlesex
County Landfill Project
Middlesex County, NJ |
| |
|
• Provided consulting services for laboratory
testing of various soils to be used onsite as landfill base and cap
material. |
2003 STRUCTURAL WORK for BUILDING 109 HVAC MODIFICATIONS
New Brunswick, NJ |
| |
IPS (Integrated Project Services)
Hillsborough, NJ |
| |
|
• Renovations to pharmaceutical building HVAC
system required replacement of existing roof mounted air handler.
• Performed evaluation of existing roof and dunnage frame; prepared
demolition and new steel arrangement designs for new HVAC unit. |
| 2003 COMMUNICATION STAIR ADDITION for office
alteration project, Florham Park, NJ |
| |
Burgess Steel, LLC
Englewood, NJ |
| |
|
• Performed engineering design, code analysis,
and structural steel shop drawing review for new “communication”
stair, connecting existing floor to floor office space. |
| ENTRY MODIFICATIONS for Bank of NY Data Center
alteration project, Somerset, NJ |
| |
|
• Performed engineering design and structural
steel shop drawing review for new building entrance proposed through
existing precast concrete exterior wall panels. |
| 2003 ROOF MOUNTED TELCOM EQUIPMENT PROJECT,
New York, NY |
| |
Tetra Tech EM, Inc.
Rockaway, NJ |
| |
|
• Addition of telcom equipment to the roof of
the Swiss Hotel in Manhattan. • Provided onsite professional
engineering consulting services; directed field investigation of existing
roof structural system, and recommended modifications to previously
designed equipment support platform. |
Additional project experience, listed below, acquired through
previous employment with Foster Wheeler.
| 1999 - 2003 Preliminary Design, Final Design
and Construction Phase Assistance for $180M Pharmaceutical Process
Scale Up Facility |
| |
Bristol-Myers Squibb
New Brunswick, NJ |
| |
|
• Designed multistory process building, chiller
building, substation, tank farm, warehouse, pipe racks, and ancillary
facilities. • Developed cost saving site preparation program
to address existing onsite construction and utilization of onsite
"problem" soils. • Utilized combination drilled
pier and spread footing systems. • Utilized semi rigid moment
frame with composite framing system for process building. •
Employed damage limiting construction to address deflagrations in
process areas, utilizing reinforced masonry and metal framing systems
• Addressed cleanliness/cGMP criteria in product finishing areas
through detailing and use of stainless steel.
|
| 2002-2003 Preliminary Design/Site Programming
for $300M Gas Fired Cogeneration Facility |
| |
ExxonMobil
Beaumont, Tx |
| |
|
• Prepared technical scope documents for IFP packages.
• Solicited quotes for civil and foundation works •
Developed soil parameters for dynamic analysis of turbine foundations.
|
| 2001-2003 Preliminary Design, Final Design,
and Construction Phase Assistance for $400M Combined Cycle Gas Fied
Power Plant |
| |
Lower Mount Bethel Energy
Martins Creek, PA |
| |
|
• Developed cost saving foundation program to
address "Karst" limestone solution cavities. •
Worked closely with site preparation and blasting contractors to address
problematic site and subsurface conditions.
|
| 2002 Roof and Structural Evaluation Report for
BioPharm Renovation in Existing Facility |
| |
Laureate Pharma
Plainsboro, NJ |
| |
|
• Evaluated existing building and proposed structural
upgrades for addition of roof mounted equipment. |
| 1999-2002 Preliminary Design, Final Design,
and Construction Assistance for retrofit of SCR systems into four
separate Coal Fired Power Plant units |
| |
Carolina Power & Light
Roxboro, NC |
| |
|
• Performed dynamic analysis and formulated concrete
repair program for existing ID fan foundations. • Utilized
creative and cost effective foundation solutions to address constraints
within existing facility: Drilled piers, micro-piles, spread footings.
• Designed ammonia storage tank foundations, retention dike,
ammonia rail and truck unloading facilities, and pipe bridges. |
| 1997-1998 Preminary Design, Final Design, and
Construction Assistance for $2B Grass Roots Refinery Complex Site
Preparation and Estimate Phases |
| |
Sincor
Jose, Venezuela |
| |
|
• Prepared heavy haul route study encompassing
evaluation of existing dock facilities, bridges, and roads. •
Prepared construction documents for new heavy haul route bridge.
• Performed condition survey of existing bridge; established
bridge repair and underpinning program. • Established and
implemented 1M cubic meter site preparation program; features included
rigorous soils testing and field monitoring programs, routing and
design of creek relocation channel, design of 20m span bridge.
• Monitored technical performance of local engineering firms.
Subcontracted additional local specialty engineering contractors to
assist with aspects of onshore and offshore evaluations. |
| 1998-2000 Final Design and Construction Assistance
for $500M Coal Fired Repowering Project |
| |
JEA
Jacksonville, Fl |
| |
|
• Developed a cost saving ground improvement program
utilizing stone columns as an alternate to pile supported foundations.
• Utilized drilled piers to support ancillary systems. |
|